Skip to main content

Roseburg High School

Campus

Campus

    • Culinary Arts/Foods
    • ECE
    • Arts
    • Band
    • Ceramics
    • Choir
    • Drama
    • Foods
    • Freshman House
    • Cafeteria
    • Library (1st Floor)
    • World Languages (3rd Floor)
    • English
    • Health/PE
    • Social Studies (1st Floor)
    • Science (2nd Floor)
    • Math (Both Floors)
    • Student Services
    • Main Office
    • Counseling Center
    • Career Center
    • Teen Health Center
    • Agriculture/Forestry
    • Automotive
    • Business
    • Drafting
    • Welding
    • Woods
  • 1899 - High School courses first taught. 1901 - Girls' basketball and boys' football team were organized. 1902 - Boys' basketball team was arranged. 1903 - First graduating class of eight students. 1905 - Debating team established 1908 - The "UMPQUA" yearbook staff was first instructed, making four volumes per year and class. 1911 - Student Council was organized to replace the Student Body organizations. 1914 - Rose school closed to students in spring. Students were then sent to Lane 1916 - Fire destroys Lane 1920-1925 - Roseburg High II was built between Douglas and Washington streets. 1926 - Present RHS was designed of concrete out in a cow pasture, "Bellows Field". The school consisted of 15 classrooms, with a combined gymnasium and auditorium. 1945-1946 - Shop Building was built. 1950 - Art Building was completed. 1951 - Humanities building rebuilt from the old Fullerton II School. 1954 - Physical Education Building was ready for use. 1964 - Commons was erected 1965 - Schools own radio station (KRHS). The Commons was finally completed. 1969 - Roseburg School District began a work experience program. 1973-1974 - The Vocational Building constructed. 1975 - Student council builds the teepee. 1988 - The Quad, Commons, Library, and two history rooms were remodeled. 1991 - Additions to electives included Macintosh classes and wellness. 1993 - Homecoming bonfire blazes after twenty years. 1994-1995 - Athletic locker rooms were remodeled. Indian sign placed in parking lot. 2001 - Weight room torn down 2002 - Started construction on the new Fine Arts building, where homes once stood next to freeway. 2003 - Completed Construction of the Fine Arts Building/Student Center. 2003 - Humanities, Fine Arts Building, and Student Center torn down, Construction on the "New Main" started. 2004 - Construction of "The New Main" completed.

  • Main

    New Main

    Vo-Tech

    Commons

    Student Center

  • Heritage

    Main

    Technical Building

    Commons

    Fine Arts Building